ALFABS/John Holland
Building on the successful delivery of the Lakemba Station project, Apex Access and Rigging was subsequently engaged to provide specialist scaffold access and encapsulation services for heritage remediation works at Dulwich Hill Station.
The scope included the provision of engineered scaffold and containment systems to the main stair and footbridge assemblies, supporting remediation works while maintaining uninterrupted rail operations. Particular consideration was given to the use of non-conductive scaffold components to eliminate electrical interference and ensure compliance with rail safety requirements outside of possession periods.