Downer/agl
Apex Access and Rigging Pty Ltd was engaged to provide specialist access solutions during multiple forced outages at
Bayswater Station throughout 2023, 2024 & 2025. The works required rapid design, mobilisation, and erection of bespoke boiler scaffolding on minimal notice, as well as swing-stage scaffolds to enable boilermakers and pressure welders to carry out critical internal boiler tube repairs.
This project demonstrated significant engineering complexity, including confined space access, load-rated temporary works, and bespoke scaffold solutions tailored to the boiler geometry. All works were delivered in strict adherence to safety compliance requirements, including site-specific risk management, occupational health and safety protocols, and engineering standards, ensuring safe and efficient delivery of critical maintenance activities under challenging operational conditions.
PROJECT GALLERY
The Urban Office Tower project was completed successfully, meeting all safety and scheduling requirements. Our efficient approach and focus on precision helped streamline the construction process and maintain a safe work environment throughout the project.